|
Product Detail :
|
NHIDCL/JK/NH-244 /EPC/TunnelKm83/2025-26 Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of Jammu and Kashmir on EPC mode
|
| Tender Detail : |
NHIDCL/JK/NH-244 /EPC/TunnelKm83/2025-26 #*. Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of Jammu and Kashmir on EPC mode |