Product Detail :
|
Improvement/ up-gradation of road leading to bgsb university. Way of earth work in cutting/filling, 30 nos. rcc culvert, protection walls, pucca drain, gsb, wbm gr-iind 75mm thick, wmm 200 mm thick, and 25 mm thick sdbc over 50 mm thick bm and rigid pavement in stretches (length= 7.0 kms).
|