Product Detail :
|
construction of road from jabra graveyard to ziarat jammu shaheed phagla,surankote km 1st rd 0 to km 2nd rd 1000, by way of earth Work in cutting,cross drainage,walling, providing and Laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii 50mm thick bm and 30 mm thick sdbc in km 1st rd 0 to km 2nd rd 1000 ,under nabard ridf xxvii. i. earth Work=km 1st rd 0 to km 2nd 1000, l=2.00 kms ii.hume pipe culverts= 10 no as per location chart iii. rcc culverts = 02 no as per location chart iv. walling= = as per location chart v. Protection Work = as per location chart
|