Product Detail :
|
Construction of breast wall adjoining to counting hall platforms at holy cave. re-modelling of meeting hall at holycave by way of increasing its size from 13’x14’ to 13’x28’ and construction of sub-structure for 02 no. rooms of camp directors at holy cave.(sub-structure & protection work only) upgradation of sewerage system at holycave by way of construction of manholes and laying of sewer line at holy cave camp plastering , pointing and painting of stone masonry walling in and around holy cave shrine area for writing of mantras, jaikaras and stotrams amd repair to the sunken portion of shoe rack at holy cave. carriage,assembling of ppgi sheet hut of size 3mx3m for camp director with attached bathroom 1.5mx1.5m before yatra including its dismantling and safe stacking after yatra 2022 at brarimarg. completion of brarimarg store and conversion of one room into residence cum office with attached washroom by way of plastering, flooring, doors and windows and plumbing/sanitary fittings at brarimarg. repairs to damaged and sunken portion of entrance and exit stairs including const. of breast wall and drain at holycave.repairs to damaged and sunken portion of entrance and exit stairs including const. of breast wall and drain at holy cave. repairs and painting of grills, donation boxes, m.s.sitting benches and g.i.pipe railings at holy cave for yatra 2022. improvement of sewerage system by way of construction of manholes and laying of sewer line at panjtarni camp.
|